underwater
  Safety Information   Installing SureLock Weight Pouches
  Dealer Inspection and Service   Inflation Methods using the i3 System
  Warranty Information   Deflation Methods using the i3 System
Basic Setup   Special Features
  Donning and Adjustment Procedures   Predive Inspection (i3 Inflation System)
  Weight Integration Features   Postdive Care and Maintenance

Routing & Attaching the MP Inflator Hose (i3 Inflators)

1. After attaching the BC and regulator to a cylinder, make sure the bladder is completely deflated.



2. Route the MP hose down the back of the BC along the cylinder and through the hook & loop hold-down. If needed, adjust the hook & loop hold-down to the desired size.

3. Thread the hose through the sleeve behind the pocket.

 

4. Remove the dust cap on the quick disconnect plug on the i3 control unit.

warning NOTE: Keep the dust cap on while not in use.

5. Grab the hose grip between your thumb and forefinger, then slide the sleeve back.

6. Place the fitting over the quick disconnect plug and firmly push inward while releasing the hose grip. Check to ensure the hose is securely attached.

7. To test the connection, slowly open the cylinder valve and pressurize the regulator. Lift up on   the lever and listen for the flow of air into the BC bladder.

warning NOTE: The Pro QDi3 and Pearl i3 are equipped with longer than normal MP inflator hoses. It is very important to use the inflator hose provided with your BC (if the hose is too short it will not reach the i3 control unit.)
Hose lengths are as follows:
XS/S – 27 inches (pn 44827) – red
M/ML/L – 33 inches (pn 44833) – lt blue   
XL  (Pro QD i3 only)  36 inches  (pn 44836) – blue
XXL  (Pro QD i3 only)  40 inches  (pn 44840) – lt gray